United States › Grid › Interconnection queues › Texas

ONSHORE WIND · ERCOT

Brazos Wind Repower

Brazos Wind Repower is a 22.4 MW onshore wind request in interconnection study in the ERCOT interconnection queue, in Scurry County, Texas.

Queue statusIn planning
  1. PlanningQueued Dec 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Nov 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
21INR0532
Grid region
ERCOT (Texas)
Developer
BRAZOS WIND VENTURES, LLC
Connection point (POI)
1064 Sun 138kV
Location
Scurry County, Texas
Technology
Wind: 22.4 MW
Total requested
22.4 MW
Study phase
SS Completed, FIS Completed, No IA
Queue status
Active
Entered queue
22 December 2020
Proposed online date
November 2025

Location

Marker shows the centre of Scurry County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Scurry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem