United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in ERCOT (Texas) — page 13
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Best Southwest BESS Battery storage |
241 MW | Paused / redesign |
| Peyton Creek Wind II Onshore wind · RWE Renewables Development, LLC |
241 MW | Agreement signed |
| Easy Wind Energy Center Wind + storage · Easy Wind Energy Center, LLC |
241 MW | In study |
| Duffy BESS Solar + storage · Duffy Energy Storage LLC |
241 MW | Agreement signed |
| Jane Storage Energy Center Battery storage · NMRE Holdings, LLC |
241 MW | In study |
| Giddings Wind Onshore wind · Pioneer Natural Resources |
240 MW | In study |
| Bob Creek Wind Onshore wind · NextEra Energy Interconnection Holdings, LLC |
240 MW | Agreement signed |
| Razorbill Solar Solar + storage · RWE Solar Development, LLC |
240 MW | In study |
| Camino Ranch Storage 2 SLF Solar + storage · Camino Ranch Solar LLC |
239 MW | In study |
| Campsey Wind Onshore wind · RWE Clean Energy Development, LLC |
238 MW | In study |
| Bracero Pecan Storage Battery storage · Bracero Pecan Storage LLC |
238 MW | Agreement signed |
| Camino Ranch Solar 2 SLF Solar + storage · Camino Ranch Solar Project LLC |
237 MW | In study |
| DeSpain Solar Project Solar · Gransolar Texas Thirteen LLC |
236 MW | In study |
| Photon Solar 1 2 SLF Solar · GulfStar Power, LLC |
236 MW | Agreement signed |
| Kuy Creek Solar 1 SLF Solar + storage · Kuy Creek Solar 1 LLC |
235 MW | In study |
| Monte Cristo 1 Wind Onshore wind · Terra-Gen |
235 MW | Agreement signed |
| Monte Cristo II Wind Onshore wind · Monte Cristo Windpower II, LLC |
234 MW | Agreement signed |
| Sbranch Solar Solar · Bernard Creek Solar, LLC |
234 MW | Agreement signed |
| Bora Bora Solar Solar |
233 MW | Paused / redesign |
| Cricket Storage Battery storage · Cricket Storage, LLC |
232 MW | In study |
| Petunia Storage Project Battery storage · Petunia Storage Project LLC |
232 MW | In study |
| Taormina Storage Battery storage · Taormina Storage Project LLC |
232 MW | Agreement signed |
| Adelite Storage Battery storage · Adelite Storage Project LLC |
232 MW | Agreement signed |
| Lavender Storage Project Battery storage · Lavender Storage Project LLC |
232 MW | Agreement signed |
| Larrea Solar Solar · Greasewood IV LLC |
232 MW | In study |
| Allthorn Solar Solar + storage · ALLTHORN SOLAR, LLC |
232 MW | In study |
| Buffalo Gap 2 Wind Repower Onshore wind · Buffalo Gap Wind Farm 2, LLC |
232 MW | Agreement signed |
| Rio Grand Valley Element Fuels Power Other · Element H2Gen, LLC |
230 MW | In study |
| Rubicon Echo Wind Onshore wind |
228 MW | Paused / redesign |
| GridGuardian BESS Battery storage · SMT Temple BESS LLC |
228 MW | In study |
| Pin Peaking Energy Center 1 (TEF- Due Diligence) Gas · PIN OAK CREEK ENERGY CENTER, LLC |
228 MW | Agreement signed |
| Pin Peaking Energy Center 2 (TEF- Due Diligence) Gas · PIN OAK CREEK ENERGY CENTER, LLC |
228 MW | Agreement signed |
| Pluto Solar Solar |
228 MW | Paused / redesign |
| Houston BESS Battery storage · SMT Houston |
228 MW | In study |
| White Tail Solar Solar · Mule Deer Solar LLC |
227 MW | In study |
| Gulf Wind 2 Onshore wind |
227 MW | Paused / redesign |
| Dunkel BESS Battery storage · Momentum Energy Storage Partners |
226 MW | In study |
| Sim Gideon Gas Rice Gas · LCRA |
226 MW | In study |
| Cedar Draw BESS Solar + storage · Cedar Draw Solar LLC |
226 MW | In study |
| Diver Solar Solar · Diver Solar |
226 MW | Agreement signed |
| Rubicon Alpha Wind Onshore wind · Throckmorton Wind, LLC |
226 MW | Agreement signed |
| Aquilla Lake 3 Wind (Alternative POI Oncor 138KV) Onshore wind |
226 MW | Paused / redesign |
| Aquilla Lake 3 Wind ( Alternative POI Oncor 345kV) Onshore wind |
226 MW | Paused / redesign |
| Bramble Energy Center Battery storage · Bramble Energy Center, LLC |
225 MW | In study |
| Castro Solar Solar · Castro Solar One, LLC |
225 MW | Agreement signed |
| Tolivar Power Plant (TEF- Due Diligence) Gas · Pecos Power Plant, LLC |
225 MW | Agreement signed |
| Tolivar Power Plant Phase 2 Gas · Pecos Power Plant, LLC |
225 MW | In study |
| Old Fiddler Energy Storage Battery storage · Old Fiddler Energy Storage LLC |
224 MW | In study |
| Carol Solar Solar |
223 MW | Paused / redesign |
| Olympic BESS Battery storage · SMT Olympic BESS LLC |
223 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)