Solar + storage projects in the connection queue on the SSEN Transmission (north Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown448.0 GW in total
In planning38scoping or awaiting consent
Consented or building6closest to connecting
Built0connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

44 projects
ProjectCapacityStageConnection siteFrom
Halfway Energy Park
Solar + storage · Dalriada Renewables Limited
1.0 GWScoping New East Coast 400kV Substation
SSEN Transmission (north Scotland)
Oct 2035
Alyth
Solar + storage · Ecodev (Alyth) Ltd
900 MWScoping Alyth Solar and Battery 400/132kV
SSEN Transmission (north Scotland)
Oct 2033
SSE Spittal Energy Park
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Spittal 400kV
SSEN Transmission (north Scotland)
Oct 2033
Peterhead PV and BESS Station
Solar + storage · ETP UK 2 LTD
480 MWAwaiting Consents New Deer 2 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Alyth
Solar + storage · Ecodev (Alyth) Ltd
450 MWScoping Alyth Solar and Battery 400/132kV
SSEN Transmission (north Scotland)
Oct 2029
Alyth Energy Storage And Solar
Solar + storage · Private Energy Partners (UK) Ltd
400 MWScoping Alyth 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Longmorn Energy Park
Solar + storage · Elgin Energy Es Co Limited
300 MWScoping Longmorn Energy Park 275kV Substation
SSEN Transmission (north Scotland)
Aug 2031
Rattray BESS and Solar Plant
Solar + storage · Greentech Projects Holding UK Limited
300 MWScoping New North East Substation 400kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Beinn Dearg
Solar + storage · Galileo 19 Limited
290 MWScoping New Taynuilt 132 kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Glenmoy Wind Solar & BESS
Solar + storage · Galileo 20 Limited
224 MWScoping Alyth 400kV Substation
SSEN Transmission (north Scotland)
Oct 2037
L48 BESS Dams of Craigie
Solar + storage · S4 UK DEV LTD
220 MWScoping L48 BESS Dams of Craigie
SSEN Transmission (north Scotland)
Oct 2033
Ardonald Wind Farm
Solar + storage · Ardonald Renewables Limited
200 MWScoping New North East 275kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Lythmore
Solar + storage · Qair Scotland Limited
200 MWScoping Thurso South 275kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Tolkien Solar Farm
Solar + storage · Tolkien Solar Farm Limited
200 MWScoping Tolkien Farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Balvedavist 162 Battery Storage
Solar + storage · S4N Spittal Ltd
162 MWAwaiting Consents Spittal 132kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Galileo 12 Limited
Solar + storage · Galileo 12 Limited
151 MWScoping Fetteresso 132kV substation
SSEN Transmission (north Scotland)
Oct 2033
Galileo 07 Limited
Solar + storage · Galileo 07 Limited
150 MWScoping Galileo 07 Limited 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2032
Kedrum Solar Farm
Solar + storage · Rosside Energy Limited
150 MWAwaiting Consents Blackhillock 275kV Substation
SSEN Transmission (north Scotland)
May 2030
Keith Solar Farm
Solar + storage · Keith Solar Pv Limited
150 MWScoping Keith Solar Farm 275kV Substation
SSEN Transmission (north Scotland)
Oct 2028
Colmealie Wind - Solar - BESS Farm
Solar + storage · Galileo 21 Limited
112 MWScoping New Fetteresso 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2037
Earraghail Renewable Energy Development (formerly Skipness & Corranbuie)
Solar + storage · Scottish Power Renewables (UK) Limited
105 MWScoping Earraghail 275/33KV Substation
SSEN Transmission (north Scotland)
Apr 2031
Kinmuck PV and BESS Station
Solar + storage · Kinmuck Energy Storage Limited
105 MWAwaiting Consents Kinmuck BESS 132kV Substation
SSEN Transmission (north Scotland)
May 2027
Cott's Farm
Solar + storage · Boralex Limited
100 MWScoping Cott's Farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2034
St Fergus
Solar + storage · Ib Vogt UK Ltd
100 MWScoping St Fergus
SSEN Transmission (north Scotland)
Oct 2033
Tealing Solar & Storage
Solar + storage · Sirius Ecodev (Tealing) Ltd
80 MWAwaiting Consents Tealing IDNO 132/33kV GSP
SSEN Transmission (north Scotland)
Oct 2028
Tormsdale Windfarm
Solar + storage · Asuk Holdco 1 Limited
70 MWScoping Mybster 3 132/33kV Substation
SSEN Transmission (north Scotland)
Jun 2028
Bilbo Farm
Solar + storage · Lel Bilbo Solar Limited
67 MWScoping Strichen 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2033
Leuchland Energy Centre A
Solar + storage · Leuchland Energy Centre Limited
57 MWScoping Leuchland Farm IDNO
SSEN Transmission (north Scotland)
Oct 2033
Leuchland Energy Centre B
Solar + storage · Leuchland Energy Centre Limited
57 MWScoping Leuchland Farm IDNO
SSEN Transmission (north Scotland)
Oct 2033
Allt an Tuir Renewable Energy Park
Solar + storage · Allt An Tuir Renewable Energy Park Limited
50 MWScoping Shin 1 GSP
SSEN Transmission (north Scotland)
Jun 2031
Garlogie B-1
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production B 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie B-2
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production B 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie C-1
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production C 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie C-2
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production C 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie PV and BESS A-1
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production A 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie PV and BESS A-2
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production A 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Locharber
Solar + storage · Lochaber Energy Centre Limited
50 MWScoping Arbroath GSP
SSEN Transmission (north Scotland)
Oct 2032
Keithick Estate
Solar + storage · Sirius Ecodev (Stirling) Ltd
50 MWUnder Construction/Commissioning Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Dec 2026
Perwinnes
Solar + storage · Perwinnes Solar And Battery Storage Limited
45 MWConsents Approved Dyce 132/33kV GSP
SSEN Transmission (north Scotland)
Oct 2028
Montreathmont Moor Forest
Solar + storage · Montreathmont Energy Centre Limited
34 MWConsents Approved Lunanhead GSP
SSEN Transmission (north Scotland)
Oct 2026
Bilbo Farm
Solar + storage · Lel Bilbo Solar Limited
25 MWUnder Construction/Commissioning Strichen 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Jun 2024
Kincraig Energy Centre
Solar + storage · Kincraig Energy Centre Limited
21 MWUnder Construction/Commissioning Dyce 132/33kV GSP
SSEN Transmission (north Scotland)
Apr 2025
Barns of Wedderburn (ABEI ENERGY GREEN VI)
Solar + storage · Abei Energy Limited
18 MWScoping Milton of Craigie GSP
SSEN Transmission (north Scotland)
Oct 2033
Keithick 16 Solar & BESS
Solar + storage · Sirius Ecodev (Keithick) Ltd
16 MWConsents Approved Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Dec 2026

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.