SOLAR + STORAGE · SHETArdonald Wind Farm
Ardonald Wind Farm is a 200 MW solar + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at New North East 275kV Substation, with capacity due from October 2033. The connection agreement is held by Ardonald Renewables Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003491
- Customer
- Ardonald Renewables Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
- Total capacity
- 200 MW
- Change in this agreement
- +200 MW
- Capacity effective from
- 31 October 2033
- Connection site
- New North East 275kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem