Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · SHETGlenmoy Wind Solar & BESS
Glenmoy Wind Solar & BESS is a 224 MW solar + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Alyth 400kV Substation, with capacity due from October 2037. The connection agreement is held by Galileo 20 Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2037 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-006134
- Customer
- Galileo 20 Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
- Total capacity
- 224 MW
- Change in this agreement
- +224 MW
- Capacity effective from
- 31 October 2037
- Connection site
- Alyth 400kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.
Other projects at Alyth 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem