🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SHET

Brigton of Ruthven BESS

Brigton of Ruthven BESS is a 500 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Alyth 400kV Substation, with capacity due from October 2033. The connection agreement is held by Morris Leslie Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004937
Customer
Morris Leslie Limited
Technology
Energy Storage System
Total capacity
500 MW
Change in this agreement
+500 MW
Capacity effective from
31 October 2033
Connection site
Alyth 400kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Alyth · Grid map

Other projects at Alyth 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem