Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · SHETL48 BESS Dams of Craigie
L48 BESS Dams of Craigie is a 220 MW solar + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at L48 BESS Dams of Craigie, with capacity due from October 2033. The connection agreement is held by S4 UK DEV LTD.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003853
- Customer
- S4 UK DEV LTD
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 220 MW
- Change in this agreement
- +220 MW
- Capacity effective from
- 31 October 2033
- Connection site
- L48 BESS Dams of Craigie
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem