Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · SHETBilbo Farm
Bilbo Farm is a 25 MW solar + storage project under construction or commissioning, connecting to the SSEN Transmission (north Scotland) network at Strichen 132/33kV GSP Substation, with capacity due from June 2024. The connection agreement is held by Lel Bilbo Solar Limited.
Project stageUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingFrom Jun 2024 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001301-1
- Customer
- Lel Bilbo Solar Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 25 MW
- Change in this agreement
- +25 MW
- Capacity effective from
- 30 June 2024
- Connection site
- Strichen 132/33kV GSP Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Under Construction/Commissioning
- Connections reform gate
- Gate 2
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Strichen 132/33kV GSP Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem