Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · SHET

Bilbo Farm

Bilbo Farm is a 25 MW solar + storage project under construction or commissioning, connecting to the SSEN Transmission (north Scotland) network at Strichen 132/33kV GSP Substation, with capacity due from June 2024. The connection agreement is held by Lel Bilbo Solar Limited.

Project stageUnder construction
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (current stage)
  4. OperatingFrom Jun 2024 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001301-1
Customer
Lel Bilbo Solar Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
25 MW
Change in this agreement
+25 MW
Capacity effective from
30 June 2024
Connection site
Strichen 132/33kV GSP Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Under Construction/Commissioning
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Strichen · Grid map

Other projects at Strichen 132/33kV GSP Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem