Grid infrastructure βΊ Connection queue βΊ Solar + storage
SOLAR + STORAGE Β· SHETSSE Spittal Energy Park
SSE Spittal Energy Park is a 600 MW solar + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Spittal 400kV, with capacity due from October 2033. The connection agreement is held by Sse De Solar Holdco Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003259
- Customer
- Sse De Solar Holdco Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 600 MW
- Change in this agreement
- +600 MW
- Capacity effective from
- 31 October 2033
- Connection site
- Spittal 400kV
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem