Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · SHET

Leuchland Energy Centre A

Leuchland Energy Centre A is a 57 MW solar + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Leuchland Farm IDNO, with capacity due from October 2033. The connection agreement is held by Leuchland Energy Centre Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-005765
Customer
Leuchland Energy Centre Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
57 MW
Change in this agreement
+57 MW
Capacity effective from
31 October 2033
Connection site
Leuchland Farm IDNO
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Leuchland Farm IDNO · Grid map

Other projects at Leuchland Farm IDNO

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem