NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Fleet Tertiary Gas · Fleet Solar Limited |
48 MW | Scoping |
| Indian Queens Battery storage · Pivoted Power LLP |
48 MW | Consents Approved |
| Indian Queens Energy Centre Solar + storage · Iq Energy Centre Limited |
48 MW | Consents Approved |
| JBM Solar -Minety Solar + storage · Jbm Solar Projects 14 Ltd |
48 MW | Scoping |
| Mannington Solar + storage · Baywa R.e. UK Limited |
48 MW | Scoping |
| Mannington Solar + storage · Pivoted Power LLP |
48 MW | Consents Approved |
| Mannington Tertiary Battery storage · Mannington Energy Centre Limited |
48 MW | Consents Approved |
| Minety Battery storage · HB411MIN Limited |
48 MW | Consents Approved |
| NatPower Llanteg Green Energy Park Battery storage · Np Spv 30 Limited |
48 MW | Scoping |
| Pond Hill Farm 1 Battery storage · PD688IRO LTD |
48 MW | Consents Approved |
| Pond Hill Farm 2 BESS Battery storage · PD688IRO LTD |
48 MW | Consents Approved |
| Somerford Solar + storage · PD688IRO LTD |
48 MW | Consents Approved |
| Southfields Solar + storage · PD688IRO LTD |
48 MW | Awaiting Consents |
| Southfields Farm Battery storage · PD688IRO LTD |
48 MW | Consents Approved |
| St Dennis Hendra Battery storage · Sambar Power Limited |
48 MW | Consents Approved |
| Willington East 1 (Tertiary) Solar + storage · Enso Green Holdings U Limited |
48 MW | Scoping |
| Willington East 2 (Tertiary) Solar + storage · Enso Green Holdings Ss Limited |
48 MW | Scoping |
| Burghfield Gas · Sse Generation Limited |
47 MW | |
| Chickerell Gas · Sse Generation Limited |
47 MW | |
| Lisa's Battery Storage Battery storage · Potencia Energy Limited |
47 MW | Awaiting Consents |
| Garbet Wind Farm Onshore wind · Garbet Wind Farm LLP |
46 MW | Consents Approved |
| Hare Craig Wind Farm Onshore wind · Hare Craig Windfarm LLP |
46 MW | Awaiting Consents |
| Blaen y Glyn Onshore wind · Banc Du Energy Park Limited |
46 MW | Scoping |
| Carraig Gheal Wind Farm Onshore wind · Greenpower (Carraig Gheal) Limited |
46 MW | |
| Crossdykes Onshore wind · Crossdykes Wf Limited |
46 MW | |
| Fasnakyle G1 & G2 Hydro and pumped storage · Sse Generation Limited |
46 MW | |
| Glenrothes BESS Battery storage · Glenrothes BESS Ltd |
46 MW | Consents Approved |
| Callisterhall Wind Farm Onshore wind · E Power Limited |
46 MW | Scoping |
| Claydon Solar B (A033) Solar + storage · RWE Renewables UK Solar and Storage Limited |
45 MW | Scoping |
| Contullich BESS Battery storage · Contullich Energy Storage Limited |
45 MW | Scoping |
| Daviot Windfarm BEGA Wind + storage · Cubico UK Development Limited |
45 MW | Scoping |
| Douglas West Onshore wind · Douglas West Wind Farm Ltd |
45 MW | |
| Glenshimmeroch Windfarm Onshore wind · Energyfarm UK Glenshimmeroch LLP |
45 MW | Consents Approved |
| Lochay (Part of Killin Cascade Hydro Scheme) Hydro and pumped storage · Sse Generation Limited |
45 MW | |
| Perwinnes Solar + storage · Perwinnes Solar And Battery Storage Limited |
45 MW | Consents Approved |
| Giants Burn Wind Farm Onshore wind · Gb Wind Farm Limited |
44 MW | Scoping |
| Beinn an Tuirc 2 Onshore wind · Scottish Power Renewables (UK) Limited |
44 MW | |
| Priestgill Wind Farm Onshore wind · Priestgill Wind Farm Limited |
44 MW | Consents Approved |
| Windy Standard III Wind Farm Onshore wind · Windy Standard III Limited |
44 MW | Consents Approved |
| Balgray Wind Farm Wind + storage · Fred Olsen Renewables Limited |
43 MW | Scoping |
| Berryburn Extension Wind Farm Onshore wind · Bb2 Wind Farm Limited |
43 MW | Consents Approved |
| Cairnborrow Wind Energy Hub Wind + storage · Bpuwl 29 Limited |
43 MW | Scoping |
| Frome Valley Energy Park Solar + storage · Biosouth Energy Limited |
43 MW | Scoping |
| Melvich Wind Energy Hub (BEGA) Wind + storage · Melvich Wind Energy Hub Limited |
43 MW | Awaiting Consents |
| Novar 2 Wind Farm Onshore wind · Headwind Development Services Limited |
43 MW | Scoping |
| A'Chruach Wind Farm Onshore wind · A'chruach Wind Farm Limited |
43 MW | |
| Bankside BESS Battery storage · Falkirk Power Ltd |
43 MW | Under Construction/Commissioning |
| Boreland BESS Battery storage · Boreland Energy Ltd |
43 MW | Scoping |
| Cleveden Road BESS Battery storage · Vital Energi Solutions Limited |
43 MW | Scoping |
| Gladsmuir Wind Farm Onshore wind · Wind Estate (UK) Limited |
43 MW | Scoping |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.