🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

NatPower Llanteg Green Energy Park

NatPower Llanteg Green Energy Park is a 48 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at South Wales West Connection Node C 400kV, with capacity due from December 2037. The connection agreement is held by Np Spv 30 Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Dec 2037 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004806
Customer
Np Spv 30 Limited
Technology
Energy Storage System
Total capacity
48 MW
Change in this agreement
+48 MW
Capacity effective from
31 December 2037
Connection site
South Wales West Connection Node C 400kV
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near South Wales West Connection Node C · Grid map

Other projects at South Wales West Connection Node C 400kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem