Grid infrastructure β€Ί Connection queue β€Ί Gas

GAS Β· NGET

Burghfield

Burghfield is a 47 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Bramley 400kV Substation. The connection agreement is held by Sse Generation Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000870
Customer
Sse Generation Limited
Technology
Thermal
Total capacity
47 MW
Already connected
47 MW
Connection site
Bramley 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Bramley Β· Grid map

Other projects at Bramley 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem