GAS Β· NGETBurghfield
Burghfield is a 47 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Bramley 400kV Substation. The connection agreement is held by Sse Generation Limited.
Connection details
- NESO project number
- PRO-000870
- Customer
- Sse Generation Limited
- Technology
- Thermal
- Total capacity
- 47 MW
- Already connected
- 47 MW
- Connection site
- Bramley 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Bramley 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem