Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· SPT

Glenrothes BESS

Glenrothes BESS is a 46 MW battery storage project consented, connecting to the SP Transmission (south Scotland) network at Glenrothes 275/33kV, with capacity due from October 2025. The connection agreement is held by Glenrothes BESS Ltd.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2025 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-002089
Customer
Glenrothes BESS Ltd
Technology
Energy Storage System
Total capacity
46 MW
Change in this agreement
+46 MW
Capacity effective from
30 October 2025
Connection site
Glenrothes 275/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Glenrothes Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem