Fleet Tertiary

Fleet Tertiary is a 48 MW gas project in planning, connecting to the National Grid (England & Wales) network at Fleet 400kV Substation, with capacity due from August 2028. The connection agreement is held by Fleet Solar Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Aug 2028 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-000429
Customer
Fleet Solar Limited
Technology
Thermal
Total capacity
48 MW
Change in this agreement
+48 MW
Capacity effective from
7 August 2028
Connection site
Fleet 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Fleet Β· Grid map

Other projects at Fleet 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem