Home › Grid infrastructure › Connection queue
NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue on the SP Transmission (south Scotland) network
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Leslie 200MW BESS Battery storage · Apatura Battery Ltd |
200 MW | Scoping |
| Milligansbush Battery Storage Battery storage · Milligansbush Battery Storage Ltd |
200 MW | Scoping |
| Murroch BESS Battery storage · Apatura Battery Ltd |
200 MW | Scoping |
| North Lanrigg Battery Storage Battery storage · North Lanrigg Battery Storage Ltd |
200 MW | Scoping |
| Pitkevy BESS Battery storage · Harmony Energy Limited |
200 MW | Scoping |
| Pond Flexible Energy Park Battery storage · Pond Flexible Energy Park Limited |
200 MW | Scoping |
| Roger Hill Farm Solar + storage · Qair Renewables UK Limited |
200 MW | Scoping |
| Rutherend Farm Battery storage · Ecocel Energy (Storage) Ltd |
200 MW | Scoping |
| Salters Battery Storage Battery storage · Buccleuch Estates, Ltd. (The) |
200 MW | Awaiting Consents |
| Whitecraig BESS Battery storage · Apatura Battery Ltd |
200 MW | Scoping |
| Whitehill Battery Storage Battery storage · Whitehill Battery Storage Ltd |
200 MW | Consents Approved |
| WindyHill BESS2 Facility Battery storage · Windyhill Grid 2 Ltd |
200 MW | Scoping |
| WindyHill Energy Storage Facility Battery storage · Windyhill Grid 1 LTD |
200 MW | Consents Approved |
| Woodcock Faulds Battery Storage Battery storage · Woodcock Faulds Battery Storage Limited |
200 MW | Scoping |
| Zenobe Coalburn Battery Storage Battery storage · Zenobe Coalburn Limited |
200 MW | Consents Approved |
| M74 West Wind Farm Solar + storage · Renewco Power Limited |
180 MW | Scoping |
| Sundhope Wind Farm Onshore wind · Black Knowe Energy Limited |
180 MW | Scoping |
| Assel Valley Extension Wind Farm Wind + storage · Renantis UK Limited |
175 MW | Scoping |
| Philiphaugh Wind Farm Onshore wind · Edf Energy Renewables Limited |
175 MW | Scoping |
| Craiglarie Wind Farm Wind + storage · Invenergy Development UK Ltd |
170 MW | Scoping |
| Innerwick BESS Battery storage · Innerwick Storage Ltd |
170 MW | Scoping |
| Bowsheil Solar and Battery Solar + storage · Voltalia UK Ltd |
167 MW | Awaiting Consents |
| Springfield Solar and Battery Solar + storage · Voltalia UK Ltd |
167 MW | Scoping |
| Harestanes Wind + storage · Scottish Power Renewables (UK) Limited |
163 MW | Under Construction/Commissioning |
| Craigdarroch Hybrid Wind and BESS Wind + storage · Voltalia UK Ltd |
159 MW | Scoping |
| Dunlaw Extension Onshore wind · Scottish Power Renewables (UK) Limited |
156 MW | |
| Longcroft Energy Park Wind + storage · Glenburnie Energy Limited |
156 MW | Scoping |
| North Lowther Energy Initiative Onshore wind · Glensalloch Wind Farm Limited |
151 MW | Scoping |
| Chapelcross Solar PV and Storage Solar + storage · Eeb68 Limited |
151 MW | Scoping |
| Arresgill Wind Farm Onshore wind · Arresgill Energy Limited |
150 MW | Scoping |
| Ayr Energy Storage Battery storage · Kxp Alpha I Limited |
150 MW | Consents Approved |
| Bishops Dal Energy Park Battery storage · Renewable Energy Systems Limited |
150 MW | Scoping |
| Bridge BESS Battery storage · Apatura Battery Ltd |
150 MW | Scoping |
| Coylton 275kV Greener Grid Park Battery storage · Coylton Energy Limited |
150 MW | Scoping |
| Downiebrae BESS Battery storage · Downiebrae BESS Ltd |
150 MW | Scoping |
| Glennifer Road BESS Battery storage · Drax BESS Neilston Limited |
150 MW | Consents Approved |
| Glentaggart 150MW BESS Battery storage · Brockwell Energy Limited |
150 MW | Scoping |
| Halbeath Solar + storage · Halbeath Solar Ltd |
150 MW | Scoping |
| Killoch BESS Battery storage · Renewable Energy Systems Limited |
150 MW | Scoping |
| Lightsource Threepwood Battery storage · Lightsource Renewable UK Development Limited |
150 MW | Scoping |
| Lightsource Mount Annan BESS Battery storage · Lightsource Renewable UK Development Limited |
150 MW | Scoping |
| Neilston 132 Battery storage · Neilston Energy Limited |
150 MW | |
| Riccarton Solar + storage · M2 Energy Storage Limited |
150 MW | Scoping |
| Torfichen Energy Park Wind + storage · Torfichen Energy Limited |
150 MW | Scoping |
| Westerton Lane BESS Battery storage · Apatura Project 22 Ltd |
150 MW | Scoping |
| Woodland Ridge Wind + storage · Cubico UK Development Limited |
150 MW | Scoping |
| Fallago Rig Wind Farm Onshore wind · Fallago Rig Windfarm Limited |
144 MW | |
| Crystal Rig II Wind Farm Onshore wind · Crystal Rig II Limited |
138 MW | |
| Sanquhar II Wind Farm Onshore wind · Sanquhar II Community Wind Co Ltd |
137 MW | Consents Approved |
| Lethans Wind Farm Onshore wind · Lethans Wind Farm Limited |
132 MW | Consents Approved |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.