Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SPTBishops Dal Energy Park
Bishops Dal Energy Park is a 150 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at BISHOPS DAL ENERGY PARK 132kV SUBSTATION, with capacity due from October 2030. The connection agreement is held by Renewable Energy Systems Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2030 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002361
- Customer
- Renewable Energy Systems Limited
- Technology
- Energy Storage System
- Total capacity
- 150 MW
- Change in this agreement
- +150 MW
- Capacity effective from
- 29 October 2030
- Connection site
- BISHOPS DAL ENERGY PARK 132kV SUBSTATION
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem