Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Killoch BESS

Killoch BESS is a 150 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Killoch BESS 132kV Substation, with capacity due from September 2030. The connection agreement is held by Renewable Energy Systems Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Sep 2030 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004171
Customer
Renewable Energy Systems Limited
Technology
Energy Storage System
Total capacity
150 MW
Change in this agreement
+150 MW
Capacity effective from
30 September 2030
Connection site
Killoch BESS 132kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Killoch BESS · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem