Grid infrastructure βΊ Connection queue βΊ Solar + storage
SOLAR + STORAGE Β· SPTM74 West Wind Farm
M74 West Wind Farm is a 180 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at M74 West Wind Farm 132kV, with capacity due from October 2029. The connection agreement is held by Renewco Power Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002398
- Customer
- Renewco Power Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
- Total capacity
- 180 MW
- Change in this agreement
- +180 MW
- Capacity effective from
- 31 October 2029
- Connection site
- M74 West Wind Farm 132kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem