Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Pond Flexible Energy Park

Pond Flexible Energy Park is a 200 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Pond Flexible Energy Park 132kV Substation, with capacity due from June 2031. The connection agreement is held by Pond Flexible Energy Park Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jun 2031 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003201
Customer
Pond Flexible Energy Park Limited
Technology
Energy Storage System
Total capacity
200 MW
Change in this agreement
+200 MW
Capacity effective from
30 June 2031
Connection site
Pond Flexible Energy Park 132kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Pond Flexible Energy Park · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem