Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SPTPond Flexible Energy Park
Pond Flexible Energy Park is a 200 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Pond Flexible Energy Park 132kV Substation, with capacity due from June 2031. The connection agreement is held by Pond Flexible Energy Park Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jun 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003201
- Customer
- Pond Flexible Energy Park Limited
- Technology
- Energy Storage System
- Total capacity
- 200 MW
- Change in this agreement
- +200 MW
- Capacity effective from
- 30 June 2031
- Connection site
- Pond Flexible Energy Park 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Projects connecting near Pond Flexible Energy Park · Grid map
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem