Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SPTNorth Lanrigg Battery Storage
North Lanrigg Battery Storage is a 200 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at North Lanrigg Substation, with capacity due from October 2028. The connection agreement is held by North Lanrigg Battery Storage Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2028 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002671
- Customer
- North Lanrigg Battery Storage Ltd
- Technology
- Demand, Energy Storage System
- Total capacity
- 200 MW
- Change in this agreement
- +200 MW
- Capacity effective from
- 30 October 2028
- Connection site
- North Lanrigg Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site