ONSHORE WIND Β· SPTFallago Rig Wind Farm
Fallago Rig Wind Farm is a 144 MW onshore wind project built and connected, connecting to the SP Transmission (south Scotland) network at Fallago 400/33kV. The connection agreement is held by Fallago Rig Windfarm Limited.
Connection details
- NESO project number
- PRO-000155
- Customer
- Fallago Rig Windfarm Limited
- Technology
- Wind Onshore
- Total capacity
- 144 MW
- Already connected
- 144 MW
- Connection site
- Fallago 400/33kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Fallago 400/33kV
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem