Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SPTDunside Wind Farm (Formally Fallago Rig 2 Wind Farm)
Dunside Wind Farm (Formally Fallago Rig 2 Wind Farm) is a 100 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Fallago 400/33kV, with capacity due from April 2029. The connection agreement is held by Edf Energy Renewables Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Apr 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-000526
- Customer
- Edf Energy Renewables Limited
- Technology
- Wind Onshore
- Total capacity
- 100 MW
- Change in this agreement
- +100 MW
- Capacity effective from
- 30 April 2029
- Connection site
- Fallago 400/33kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Fallago 400/33kV
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem