Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SPTSundhope Wind Farm
Sundhope Wind Farm is a 180 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Sundhope 132kV Substation, with capacity due from May 2033. The connection agreement is held by Black Knowe Energy Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom May 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002767
- Customer
- Black Knowe Energy Limited
- Technology
- Wind Onshore
- Total capacity
- 180 MW
- Change in this agreement
- +180 MW
- Capacity effective from
- 30 May 2033
- Connection site
- Sundhope 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem