Crystal Rig II Wind Farm

Crystal Rig II Wind Farm is a 138 MW onshore wind project built and connected, connecting to the SP Transmission (south Scotland) network at Crystal Rig 132/33kV. The connection agreement is held by Crystal Rig II Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000414
Customer
Crystal Rig II Limited
Technology
Wind Onshore
Total capacity
138 MW
Already connected
138 MW
Connection site
Crystal Rig 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Crystal Rig Β· Grid map

Other projects at Crystal Rig 132/33kV