Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SPTZenobe Coalburn Battery Storage
Zenobe Coalburn Battery Storage is a 200 MW battery storage project consented, connecting to the SP Transmission (south Scotland) network at Coalburn North 400kV Substation, with capacity due from August 2027. The connection agreement is held by Zenobe Coalburn Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Aug 2027 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001780
- Customer
- Zenobe Coalburn Limited
- Technology
- Energy Storage System
- Total capacity
- 200 MW
- Change in this agreement
- +200 MW
- Capacity effective from
- 31 August 2027
- Connection site
- Coalburn North 400kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
- Connections reform gate
- Gate 2
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem