BATTERY STORAGE · SPT

Zenobe Coalburn Battery Storage

Zenobe Coalburn Battery Storage is a 200 MW battery storage project consented, connecting to the SP Transmission (south Scotland) network at Coalburn North 400kV Substation, with capacity due from August 2027. The connection agreement is held by Zenobe Coalburn Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Aug 2027 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001780
Customer
Zenobe Coalburn Limited
Technology
Energy Storage System
Total capacity
200 MW
Change in this agreement
+200 MW
Capacity effective from
31 August 2027
Connection site
Coalburn North 400kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Coalburn North · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem