Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · SPT

Chapelcross Solar PV and Storage

Chapelcross Solar PV and Storage is a 151 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Chapelcross 132/33kV, with capacity due from October 2027. The connection agreement is held by Eeb68 Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2027 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002031
Customer
Eeb68 Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
151 MW
Change in this agreement
+151 MW
Capacity effective from
29 October 2027
Connection site
Chapelcross 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Chapelcross · Grid map

Other projects at Chapelcross 132/33kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem