BATTERY STORAGE · SPTNeilston 132
Neilston 132 is a 150 MW battery storage project built and connected, connecting to the SP Transmission (south Scotland) network at Neilston 132kV Substation. The connection agreement is held by Neilston Energy Limited.
Connection details
- NESO project number
- PRO-001343
- Customer
- Neilston Energy Limited
- Technology
- Energy Storage System
- Total capacity
- 150 MW
- Already connected
- 50 MW
- Change in this agreement
- +100 MW
- Capacity effective from
- 31 October 2025
- Connection site
- Neilston 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem