United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) (2021 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Offshore wind Offshore wind |
1,320 MW | Withdrawn / abandoned |
| Offshore wind Offshore wind |
1,200 MW | Withdrawn / abandoned |
| Offshore wind Offshore wind |
440 MW | Withdrawn / abandoned |
| Offshore wind Increase (QP909) Offshore wind |
386 MW | Withdrawn / abandoned |
| Increase to Pumping load Battery storage |
333 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
325 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
276 MW | Withdrawn / abandoned |
| Storage Battery storage |
242 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
205 MW | Withdrawn / abandoned |
| Streamfield Battery storage |
202 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
189 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
189 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
170 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
160 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
150 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
113 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
108 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
105 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
105 MW | Withdrawn / abandoned |
| Solar Solar |
103 MW | Withdrawn / abandoned |
| Solar Solar |
101 MW | Withdrawn / abandoned |
| Solar Solar |
101 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Energy Storage Battery storage |
99.9 MW | Withdrawn / abandoned |
| Solar with Battery Solar + storage |
87.0 MW | Withdrawn / abandoned |
| Solar Solar |
72.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
55.0 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
53.1 MW | Withdrawn / abandoned |
| Solar Solar |
51.4 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
50.4 MW | Withdrawn / abandoned |
| Swain Solar Solar |
40.4 MW | Withdrawn / abandoned |
| E. Winchendon Substation - NG WMA Group 3 Solar + storage |
35.0 MW | Withdrawn / abandoned |
| Solar Solar |
31.4 MW | Withdrawn / abandoned |
| CMP Lakewood 115 kV SS - Winslow-Lakewood Areas Study Solar |
28.7 MW | Withdrawn / abandoned |
| Wendall Depot Substation - NG WMA Group 3 Solar + storage |
28.0 MW | Withdrawn / abandoned |
| Snow St. Substation - NG WMA Group 3 Solar + storage |
27.8 MW | Withdrawn / abandoned |
| Solar Solar |
26.0 MW | Withdrawn / abandoned |
| Stafford St. Substation - NG WMA Group 3 Solar + storage |
22.4 MW | Withdrawn / abandoned |
| Solar Solar |
20.7 MW | Withdrawn / abandoned |
| N. Oxford Substation - NG WMA Group 3 Solar + storage |
20.4 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| W. Charlton Substation - NG WMA Group 3 Battery storage |
20.0 MW | Withdrawn / abandoned |
| CMP Winslow 115 kV SS - Winslow-Lakewood Areas Study Solar + storage |
18.7 MW | Withdrawn / abandoned |
| Pratts Junc. Substation - NG WMA Group 3 Battery storage |
14.9 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)220 Β· 82.8 GW
- West (non-ISO utilities)339 Β· 78.3 GW
- PJM (Mid-Atlantic, Midwest)819 Β· 65.0 GW
- MISO (Midcontinent)267 Β· 38.5 GW
- NYISO (New York)149 Β· 23.5 GW
- Southeast (non-ISO utilities)123 Β· 16.3 GW
- ERCOT (Texas)77 Β· 13.4 GW
- SPP (Southwest Power Pool)70 Β· 13.1 GW
- ISO-NE (New England)85 Β· 8,317 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)