United States › Grid › Interconnection queues › Connecticut
SOLAR + STORAGE · ISO-NESolar with Battery
Solar with Battery is a 87.0 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Windham County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedJun 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1162
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- POI will be the three breaker ring bus at the 1607 Line. Approximate Coordinates 41.7119, -71.9379.
- Location
- Windham County, Connecticut
- Technology
- Solar: 87.0 MW · Battery
- Total requested
- 87.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 21 September 2021
- Proposed online date
- December 2023
- Withdrawn
- June 2023
Location
No county location in the queue data.
Power plants in Connecticut · Transmission lines in Connecticut
Other requests in Windham County
- Husky SolarSolar · 50.2 MW · agreement signed
- Lake Road UpgradesGas · 49.8 MW · built
- Quinebaug SolarSolar · 49.0 MW · built
- Plainfield Renewable Energy ProjectOther · 37.5 MW · built
- Mechanicsville Hydro IncreaseHydro · 0.3 MW · built
- Combined CycleGas · 1,120 MW · withdrawn
- NTE ConnecticutGas · 672 MW · withdrawn
- Combined CycleGas · 563 MW · withdrawn
- Battery StorageBattery storage · 325 MW · withdrawn
- Battery StorageBattery storage · 300 MW · withdrawn
- Combined CycleGas · 250 MW · withdrawn
- Battery StorageBattery storage · 205 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem