United States › Grid › Interconnection queues › Connecticut

SOLAR + STORAGE · ISO-NE

Solar with Battery

Solar with Battery is a 87.0 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Windham County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedJun 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1162
Grid region
ISO-NE (New England)
Connection point (POI)
POI will be the three breaker ring bus at the 1607 Line. Approximate Coordinates 41.7119, -71.9379.
Location
Windham County, Connecticut
Technology
Solar: 87.0 MW · Battery
Total requested
87.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
21 September 2021
Proposed online date
December 2023
Withdrawn
June 2023

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Windham County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem