🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Massachusetts

BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 20.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Norfolk County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2021 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1111
Grid region
ISO-NE (New England)
Connection point (POI)
Ever Source 115kV Ring Station 150 (@ spare bay in breaker and-a-half switchyard)
Location
Norfolk County, Massachusetts
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Not Started
Queue status
Withdrawn
Entered queue
22 March 2021
Proposed online date
March 2026
Withdrawn
September 2023

Location

Marker shows the centre of Norfolk County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Norfolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem