United States › Grid › Interconnection queues › Rhode Island
BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 200 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Kent County, Rhode Island.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedNov 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1102
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- NEC 115 kV G-185S-2
- Location
- Kent County, Rhode Island
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 1 March 2021
- Proposed online date
- March 2023
- Withdrawn
- November 2021
Location
Marker shows the centre of Kent County; the queue data does not give exact sites.
Power plants in Rhode Island · Transmission lines in Rhode Island
Other requests in Kent County
- University SolarSolar · 31.3 MW · built
- SolarSolar · 20.0 MW · built
- Battery StorageBattery storage · 62.8 MW · withdrawn
- Kent County - NG WRI DG Area Study #2 >5 MWSolar · 49.8 MW · withdrawn
- Battery StorageBattery storage · 40.0 MW · withdrawn
- Kent County Substation - Western RI DER Study #3Solar · 21.7 MW · withdrawn
- Kent County - NG WRI DG Area Study #2 <5 MWSolar · 13.5 MW · withdrawn
- Kent County Substation - NG Western RI DG Area StudySolar · 10.4 MW · withdrawn
- SolarSolar · 9.8 MW · withdrawn
- Warren Substation ‚Äì NG RI-Warren-20-Comp-1 StudySolar · 6.9 MW · withdrawn
- Drumrock - NG WRI DG Area Study #2 <5 MWSolar · 5.0 MW · withdrawn
- New London - NG WRI DG Area Study #2 <5 MWSolar · 4.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem