United States β€Ί Grid β€Ί Interconnection queues β€Ί Rhode Island

SOLAR Β· ISO-NE

New London - NG WRI DG Area Study #2 <5 MW

New London - NG WRI DG Area Study #2 <5 MW is a 4.9 MW solar request withdrawn in the ISO-NE interconnection queue, in Kent County, Rhode Island, connecting to NGRID.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2020 (completed)
  2. Withdrawn / abandonedSep 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1048
Grid region
ISO-NE (New England)
Utility / transmission owner
NGRID
Connection point (POI)
NG New London substation, feeder 150F4
Location
Kent County, Rhode Island
Technology
Solar: 4.9 MW
Total requested
4.9 MW
Queue status
Withdrawn
Entered queue
19 August 2020
Proposed online date
April 2022
Withdrawn
September 2021

Location

Marker shows the centre of Kent County; the queue data does not give exact sites.

Power plants in Rhode Island Β· Transmission lines in Rhode Island

Other requests in Kent County