United States › Grid › Interconnection queues › Rhode Island
SOLAR · ISO-NEKent County Substation - Western RI DER Study #3
Kent County Substation - Western RI DER Study #3 is a 21.7 MW solar request withdrawn in the ISO-NE interconnection queue, in Kent County, Rhode Island.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2024 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1589
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- RIE feeder 3309 and 3311, Kent County Substation
- Location
- Kent County, Rhode Island
- Technology
- Solar: 21.7 MW
- Total requested
- 21.7 MW
- Queue status
- Withdrawn
- Entered queue
- 19 August 2024
- Proposed online date
- December 2026
- Withdrawn
- June 2025
Location
Marker shows the centre of Kent County; the queue data does not give exact sites.
Power plants in Rhode Island · Transmission lines in Rhode Island
Other requests in Kent County
- University SolarSolar · 31.3 MW · built
- SolarSolar · 20.0 MW · built
- Battery StorageBattery storage · 200 MW · withdrawn
- Battery StorageBattery storage · 62.8 MW · withdrawn
- Kent County - NG WRI DG Area Study #2 >5 MWSolar · 49.8 MW · withdrawn
- Battery StorageBattery storage · 40.0 MW · withdrawn
- Kent County - NG WRI DG Area Study #2 <5 MWSolar · 13.5 MW · withdrawn
- Kent County Substation - NG Western RI DG Area StudySolar · 10.4 MW · withdrawn
- SolarSolar · 9.8 MW · withdrawn
- Warren Substation ‚Äì NG RI-Warren-20-Comp-1 StudySolar · 6.9 MW · withdrawn
- Drumrock - NG WRI DG Area Study #2 <5 MWSolar · 5.0 MW · withdrawn
- New London - NG WRI DG Area Study #2 <5 MWSolar · 4.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem