United States βΊ Grid βΊ Interconnection queues βΊ Rhode Island
SOLAR Β· ISO-NEDrumrock - NG WRI DG Area Study #2 <5 MW
Drumrock - NG WRI DG Area Study #2 <5 MW is a 5.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Kent County, Rhode Island, connecting to NGRID.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2020 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1044
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NGRID
- Connection point (POI)
- NG Drumrock sustation, feeder 14F4
- Location
- Kent County, Rhode Island
- Technology
- Solar: 5.0 MW
- Total requested
- 5.0 MW
- Queue status
- Withdrawn
- Entered queue
- 19 August 2020
- Proposed online date
- April 2022
- Withdrawn
- June 2025
Location
Marker shows the centre of Kent County; the queue data does not give exact sites.
Power plants in Rhode Island Β· Transmission lines in Rhode Island
Other requests in Kent County
- University SolarSolar Β· 31.3 MW Β· built
- SolarSolar Β· 20.0 MW Β· built
- Battery StorageBattery storage Β· 200 MW Β· withdrawn
- Battery StorageBattery storage Β· 62.8 MW Β· withdrawn
- Kent County - NG WRI DG Area Study #2 >5 MWSolar Β· 49.8 MW Β· withdrawn
- Battery StorageBattery storage Β· 40.0 MW Β· withdrawn
- Kent County Substation - Western RI DER Study #3Solar Β· 21.7 MW Β· withdrawn
- Kent County - NG WRI DG Area Study #2 <5 MWSolar Β· 13.5 MW Β· withdrawn
- Kent County Substation - NG Western RI DG Area StudySolar Β· 10.4 MW Β· withdrawn
- SolarSolar Β· 9.8 MW Β· withdrawn
- Warren Substation βΓΓ¬ NG RI-Warren-20-Comp-1 StudySolar Β· 6.9 MW Β· withdrawn
- New London - NG WRI DG Area Study #2 <5 MWSolar Β· 4.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem