BATTERY STORAGE Β· ISO-NE

Storage

Storage is a 242 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Bristol County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2021 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1198
Grid region
ISO-NE (New England)
Connection point (POI)
Looping the D-182S line adjacent to National Gridβ€šΓ„Γ΄s 115 kV Reynoldβ€šΓ„Γ΄s Ave Substation
Location
Bristol County, Massachusetts
Technology
Battery: 242 MW
Total requested
242 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
30 December 2021
Proposed online date
May 2028
Withdrawn
September 2025

Location

Marker shows the centre of Bristol County; the queue data does not give exact sites.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Other requests in Bristol County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem