SOLAR + STORAGE · ISO-NECMP Winslow 115 kV SS - Winslow-Lakewood Areas Study
CMP Winslow 115 kV SS - Winslow-Lakewood Areas Study is a 18.7 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Somerset County, Maine, connecting to CMP.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2021 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1096
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- CMP
- Connection point (POI)
- CMP Winslow 115 kV SS
- Location
- Somerset County, Maine
- Technology
- Solar: 18.7 MW · Battery
- Total requested
- 18.7 MW
- Queue status
- Withdrawn
- Entered queue
- 4 February 2021
- Proposed online date
- April 2024
- Withdrawn
- June 2025
Location
Marker shows the centre of Somerset County; the queue data does not give exact sites.
Other requests in Somerset County
- SolarSolar · 165 MW · agreement signed
- SolarFairfieldSolar · 18.1 MW · agreement signed
- Bingham WindOnshore wind · 185 MW · built
- Three Corners SolarSolar · 110 MW · built
- Western Maine Wind ProjectOnshore wind · 58.8 MW · built
- Weston Station AVR Replacement U2-4Hydro · 14.8 MW · built
- Wyman Hydro Uprate U1Hydro · 2.5 MW · built
- SolarSolar · 165 MW · withdrawn
- SolarSolar · 152 MW · withdrawn
- SolarSolar · 150 MW · withdrawn
- WindOnshore wind · 117 MW · withdrawn
- SolarSolar · 103 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem