🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Massachusetts

BATTERY STORAGE · ISO-NE

Increase to Pumping load

Increase to Pumping load is a 333 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Berkshire County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2021 (completed)
  2. Withdrawn / abandonedNov 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1191
Grid region
ISO-NE (New England)
Connection point (POI)
The current Bear Swamp interconnection points
Location
Berkshire County, Massachusetts
Technology
Other Storage: 333 MW
Total requested
333 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
3 November 2021
Proposed online date
November 2021
Withdrawn
November 2021

Location

Marker shows the centre of Berkshire County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Berkshire County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem