United States › Grid › Interconnection queues › Massachusetts

BATTERY STORAGE · ISO-NE

W. Charlton Substation - NG WMA Group 3

W. Charlton Substation - NG WMA Group 3 is a 20.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Worcester County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2021 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1187
Grid region
ISO-NE (New England)
Connection point (POI)
NG W. Charlton Substation
Location
Worcester County, Massachusetts
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
27 October 2021
Proposed online date
December 2027
Withdrawn
June 2025

Location

Marker shows the centre of Worcester County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Worcester County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem