United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas (2025 requests) — page 8
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Strawberry Dunes Solar SLF Solar + storage · Strawberry Dunes LLC |
101 MW | In study |
| Calf Creek Storage Battery storage · Coyote Ridge Storage, LLC |
101 MW | In study |
| Goat Mountain BESS 2 Wind + storage · Goat Wind LLC |
101 MW | In study |
| Mobee Springs BESS Battery storage · Mobee Springs, LLC |
101 MW | In study |
| Firefly Fields Solar Solar + storage · Firefly Fields Energy Center LLC |
101 MW | In study |
| Diamond Sage BESS 2 Solar + storage · DGC Renewables, LLC |
100 MW | In study |
| Diamond Sage BESS 1 Solar + storage · DGC Renewables, LLC |
100 MW | In study |
| Erika BESS Solar + storage · Erika Solar, LLC |
100 MW | In study |
| Solar project J4124, Trinity County Solar |
100 MW | In study |
| Radiant Plains Energy Center Solar Solar + storage · Adapture Solar Development |
100 MW | In study |
| Solar project GEN-2024-241, Bowie County Solar |
100 MW | In study |
| Radiant Plains Energy Center BESS Solar + storage · Adapture Solar Development |
100 MW | In study |
| Timmerman Power Plant Phase 2B Gas · Lower Colorado River Authority |
94.2 MW | Agreement signed |
| Rattlesnake Gap Solar SLF Solar + storage · ET Fuels US Inc. |
93.0 MW | In study |
| Bandana Solar SLF Solar |
86.9 MW | Paused / redesign |
| Galaxy I Solar Solar + storage · Galaxy Solar, LLC |
82.9 MW | In study |
| Soluce Bravo Solar Solar + storage · BNPB1, LLC |
80.5 MW | In study |
| Lytton Springs BESS Solar + storage · SMT Lytton Springs LLC |
76.4 MW | In study |
| Donelson Solar SLF Solar + storage · Donelson Solar |
75.4 MW | In study |
| Lytton Springs Solar Solar + storage · SMT Lytton Springs LLC |
75.3 MW | In study |
| Texas Sun Solar Solar · Pigg Grounds LLC |
71.7 MW | In study |
| 7L Solar SLF Solar + storage · 7L Solar, LLC |
71.6 MW | In study |
| Onshore wind project GEN-2025-SR2, Hansford County Onshore wind |
67.2 MW | In study |
| PRI Solar Solar · BHER Power Resources, Inc. |
63.8 MW | In study |
| Iron Cowboy Storage Solar + storage · Vaquero II Storage, LLC |
63.3 MW | In study |
| Borden Dino BESS Solar + storage · Borden Dino Solar, LLC |
60.3 MW | In study |
| Silver Hills Windpower Onshore wind · Silver Hills Windpower, LLC |
54.1 MW | In study |
| Wagon Timber Storage Solar + storage · Wagon Timber Storage, LLC |
53.5 MW | In study |
| Onshore wind project GEN-2026-PR1, Ochiltree County Onshore wind |
52.6 MW | In study |
| GPlains Storage Solar + storage · Gypsum Plains Solar, LLC |
51.3 MW | In study |
| Crocus Storage Solar + storage · Crocus Solar, LLC |
51.0 MW | In study |
| Battery storage project GEN-2024-305, Marion County Battery storage |
50.0 MW | In study |
| Dart Energy Storage A1 Battery storage · Dart Energy Storage LLC |
50.0 MW | In study |
| Buck Ranch Storage SLF Solar + storage · Buck Ranch Solar, LLC |
40.8 MW | In study |
| Paolo Sole Hamilton Solar Solar · Viridian Power Development, LLC |
40.6 MW | In study |
| Paolo Sole Gustine Solar Solar · Viridian Power Development, LLC |
40.3 MW | In study |
| Ashra Solar SLF Solar + storage · Ashra Solar, LLC |
40.3 MW | In study |
| Staghorn Gas Gas · RPC Merchant LLC |
10.0 MW | Agreement signed |
| Harlingen #1 BESS 1 Battery storage · Harlingen ESS Assets LLC |
10.0 MW | Agreement signed |
| Mesquite BESS2 Battery storage · Mesquite Clean Energy Center, LLC |
10.0 MW | Agreement signed |
| Knapp BESS Battery storage · Knapp ESS Assets, LLC |
10.0 MW | Agreement signed |
| Beck_Road BESS1 Battery storage · Bexar Corrilla LLC |
10.0 MW | Agreement signed |
| Meadow Park BESS Battery storage · Meadow Park ESS Assets, LLC |
10.0 MW | Agreement signed |
| Alamo Street BESS Battery storage · Alamo Clean Energy Center, LLC |
10.0 MW | Agreement signed |
| Berry BESS1 Battery storage · ESTX-PLD-HOUSTON8, LLC |
10.0 MW | Agreement signed |
| North Edinburg BESS 1 Battery storage · Edinburg ESS Assets LLC |
10.0 MW | Agreement signed |
| Roadrunner Crossing Wind (Uprate) Wind + storage · Roadrunner Wind, LLC |
3.3 MW | In study |
| Ashra Storage SLF Solar + storage · Ashra Solar, LLC |
1.6 MW | In study |
| Kickstart Energy Storage IV Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Kickstart Energy Storage III Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)358 · 104.0 GW
- SPP (Southwest Power Pool)33 · 9,266 MW
- MISO (Midcontinent)6 · 2,017 MW
- West (non-ISO utilities)5 · 997 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)