United States › Grid › Interconnection queues › Washington

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in Washington — page 5

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown20758.5 GW
Active in queue58.5 GW207 requests
Agreement signed3,095 MW26 requests
Withdrawn499103.5 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

207 requests · page 5 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project CS24-01, Adams County
Solar
1.0 MWAgreement signed Adams, WAWest Mar 2024target 2024
Solar project G1068, Clark County
Solar
1.0 MWIn study Clark, WAWest Jun 2024target 2024
Solar project G0968, Clark County
Solar
1.0 MWIn study Clark, WAWest Oct 2023target 2023
Solar project 71, Lincoln County
Solar
1.0 MWIn study Lincoln, WAWest Oct 2018target 2020
Other project 15, Skagit County
Other
0.8 MWIn study Skagit, WAWest Mar 2008target 2008
Battery storage project CS24-02, Spokane County
Battery storage
0.5 MWAgreement signed Spokane, WAWest Apr 2024target 2025
Gas project 41, Lincoln County
Gas
0.3 MWIn study Lincoln, WAWest Apr 2014target 2014
Page 5 of 5

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20122025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)