| Project | Capacity | Status |
|---|---|---|
| Solar + storage project J2760, Hubbard County Solar + storage |
68.0 MW | Withdrawn / abandoned |
| Solar project 569996, Chesterfield County Solar |
66.0 MW | Withdrawn / abandoned |
| Battery storage project J2008, Callaway County Battery storage |
65.0 MW | Withdrawn / abandoned |
| Solar project J2354, Marinette County Solar |
65.0 MW | Withdrawn / abandoned |
| Solar project 568778, Richmond County Solar |
65.0 MW | Withdrawn / abandoned |
| Solar project J2637, Monroe County Solar |
64.5 MW | Withdrawn / abandoned |
| Replacing 50 MW of solar generation with BESS; Duane Arnold Other |
64.0 MW | Withdrawn / abandoned |
| Sun Cactus Storage Other ยท Sun Cactus Solar Project, LLC |
63.2 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
62.8 MW | Withdrawn / abandoned |
| NY Johnstown 378 State Hwy 334 Storage Battery storage ยท Bluewave Storage Origination LLC |
62.5 MW | Withdrawn / abandoned |
| Enbridge Ingleside Solar SLF Solar ยท Enbridge Ingleside Solar, LLC |
61.9 MW | Withdrawn / abandoned |
| Solar project J2633, Van Buren County Solar |
61.0 MW | Withdrawn / abandoned |
| Rosie Solar Solar ยท Industrial Delta Project LLC |
61.0 MW | Withdrawn / abandoned |
| Poplar 1 Energy Center Battery storage ยท Poplar Energy Center, LLC |
60.0 MW | Withdrawn / abandoned |
| Solar project J3010, Clay County Solar |
60.0 MW | Withdrawn / abandoned |
| Solar project J3217, Cottonwood County Solar |
60.0 MW | Withdrawn / abandoned |
| Solar + storage project J2278, Edgar County Solar + storage |
60.0 MW | Withdrawn / abandoned |
| Solar project 566856, Columbus County Solar |
60.0 MW | Withdrawn / abandoned |
| Solar + storage project AH2-277, Buchanan County Solar + storage |
60.0 MW | Withdrawn / abandoned |
| Solar project AH2-222 Solar |
60.0 MW | Withdrawn / abandoned |
| Solar project 569524, Marlboro County Solar |
60.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
60.0 MW | Withdrawn / abandoned |
| Solar project AI1-117 Solar |
60.0 MW | Withdrawn / abandoned |
| Solar project 566734, Darlington County Solar |
60.0 MW | Withdrawn / abandoned |
| Battery storage project J2359, Madison County Battery storage |
58.5 MW | Withdrawn / abandoned |
| Solar project J2699, East Carroll Parish County Solar |
58.1 MW | Withdrawn / abandoned |
| Solar project J2638, Nevada County Solar |
58.0 MW | Withdrawn / abandoned |
| Solar project 568024, Union County Solar |
58.0 MW | Withdrawn / abandoned |
| Detroit/Guilford/Belfast DG Area Study Solar + storage |
57.7 MW | Withdrawn / abandoned |
| Solar + storage project C2-134, Millard County Solar + storage |
57.5 MW | Withdrawn / abandoned |
| Solar + storage project C2-129, San Juan County Solar + storage |
57.5 MW | Withdrawn / abandoned |
| NY Schodack 634 Knickerbocker Rd Storage Battery storage ยท Bluewave Storage Origination LLC |
57.0 MW | Withdrawn / abandoned |
| Solar project 511, Crockett County Solar |
55.0 MW | Withdrawn / abandoned |
| Battery storage project GEN-2022-060, Osage County Battery storage |
55.0 MW | Withdrawn / abandoned |
| Solar project 518, Madison County Solar |
55.0 MW | Withdrawn / abandoned |
| Battery storage project GEN-2022-027, Cochran County Battery storage |
55.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
55.0 MW | Withdrawn / abandoned |
| Solar project 85, Hillsborough County Solar |
55.0 MW | Withdrawn / abandoned |
| Solar project 91, Polk County Solar |
55.0 MW | Withdrawn / abandoned |
| Solar project 90, Hillsborough County Solar |
55.0 MW | Withdrawn / abandoned |
| Homer Hill Storage Battery storage ยท Origis Development |
54.7 MW | Withdrawn / abandoned |
| Solar project AI1-157, Mchenry County Solar |
54.4 MW | Withdrawn / abandoned |
| Solar Solar |
54.4 MW | Withdrawn / abandoned |
| Solar Increase (QP1145) Solar |
54.1 MW | Withdrawn / abandoned |
| Lewiston CMP Cluster 5 Solar + storage |
52.5 MW | Withdrawn / abandoned |
| Solar project J2635, Mason County Solar |
52.0 MW | Withdrawn / abandoned |
| Brentwood Energy Storage Battery storage ยท NY Power Authority |
52.0 MW | Withdrawn / abandoned |
| Pouch Energy Storage Battery storage ยท NY Power Authority |
52.0 MW | Withdrawn / abandoned |
| Solar project 569234, Johnston County Solar |
51.7 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
51.7 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)494 ยท 132.6 GW
- MISO (Midcontinent)567 ยท 94.5 GW
- NYISO (New York)165 ยท 57.3 GW
- Southeast (non-ISO utilities)211 ยท 28.0 GW
- SPP (Southwest Power Pool)91 ยท 19.4 GW
- PJM (Mid-Atlantic, Midwest)182 ยท 19.3 GW
- ERCOT (Texas)76 ยท 15.5 GW
- ISO-NE (New England)98 ยท 12.0 GW
- CAISO (California)2 ยท 377 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)