United States โ€บ Grid โ€บ Interconnection queues

OCTARY USA ยท INTERCONNECTION QUEUES

Withdrawn queue requests in the USA (2022 requests) โ€” page 30

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,886378.9 GW
Active in queue299.4 GW1,514 requests
Agreement signed43.0 GW228 requests
Withdrawn1,886378.9 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,886 requests ยท page 30 of 38
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project J2760, Hubbard County
Solar + storage
68.0 MWWithdrawn / abandoned Hubbard, MNMISO Sep 2022target 2027
Solar project 569996, Chesterfield County
Solar
66.0 MWWithdrawn / abandoned Chesterfield, SCSoutheast Jun 2022
Battery storage project J2008, Callaway County
Battery storage
65.0 MWWithdrawn / abandoned Callaway, MOMISO Mar 2022target 2025
Solar project J2354, Marinette County
Solar
65.0 MWWithdrawn / abandoned Marinette, WIMISO Sep 2022target 2024
Solar project 568778, Richmond County
Solar
65.0 MWWithdrawn / abandoned Richmond, NCSoutheast Jun 2022
Solar project J2637, Monroe County
Solar
64.5 MWWithdrawn / abandoned Monroe, ARMISO Sep 2022target 2025
Replacing 50 MW of solar generation with BESS; Duane Arnold
Other
64.0 MWWithdrawn / abandoned Linn, IAMISO Oct 2022target 2023
Sun Cactus Storage
Other ยท Sun Cactus Solar Project, LLC
63.2 MWWithdrawn / abandoned Duval, TXERCOT Jul 2022target 2026
Battery Storage
Battery storage
62.8 MWWithdrawn / abandoned Kent, RIISO-NE Mar 2022target 2025
NY Johnstown 378 State Hwy 334 Storage
Battery storage ยท Bluewave Storage Origination LLC
62.5 MWWithdrawn / abandoned Fulton, NYNYISO Aug 2022
Enbridge Ingleside Solar SLF
Solar ยท Enbridge Ingleside Solar, LLC
61.9 MWWithdrawn / abandoned San Patricio, TXERCOT Aug 2022target 2025
Solar project J2633, Van Buren County
Solar
61.0 MWWithdrawn / abandoned Van Buren, ARMISO Sep 2022target 2025
Rosie Solar
Solar ยท Industrial Delta Project LLC
61.0 MWWithdrawn / abandoned Winkler, TXERCOT Nov 2022target 2026
Poplar 1 Energy Center
Battery storage ยท Poplar Energy Center, LLC
60.0 MWWithdrawn / abandoned Suffolk, NYNYISO Jul 2022
Solar project J3010, Clay County
Solar
60.0 MWWithdrawn / abandoned Clay, INMISO Sep 2022target 2027
Solar project J3217, Cottonwood County
Solar
60.0 MWWithdrawn / abandoned Cottonwood, MNMISO Sep 2022target 2026
Solar + storage project J2278, Edgar County
Solar + storage
60.0 MWWithdrawn / abandoned Edgar, ILMISO Mar 2022target 2025
Solar project 566856, Columbus County
Solar
60.0 MWWithdrawn / abandoned Columbus, NCSoutheast Jun 2022
Solar + storage project AH2-277, Buchanan County
Solar + storage
60.0 MWWithdrawn / abandoned Buchanan, VAPJM Mar 2022target 2024
Solar project AH2-222
Solar
60.0 MWWithdrawn / abandoned KYPJM Mar 2022target 2026
Solar project 569524, Marlboro County
Solar
60.0 MWWithdrawn / abandoned Marlboro, SCSoutheast Jun 2022
Battery Storage
Battery storage
60.0 MWWithdrawn / abandoned Hartford, CTISO-NE Apr 2022target 2024
Solar project AI1-117
Solar
60.0 MWWithdrawn / abandoned WVPJM Sep 2022target 2024
Solar project 566734, Darlington County
Solar
60.0 MWWithdrawn / abandoned Darlington, SCSoutheast Jun 2022
Battery storage project J2359, Madison County
Battery storage
58.5 MWWithdrawn / abandoned Madison, MSMISO Sep 2022target 2024
Solar project J2699, East Carroll Parish County
Solar
58.1 MWWithdrawn / abandoned East Carroll Parish, LAMISO Sep 2022target 2027
Solar project J2638, Nevada County
Solar
58.0 MWWithdrawn / abandoned Nevada, ARMISO Sep 2022target 2025
Solar project 568024, Union County
Solar
58.0 MWWithdrawn / abandoned Union, SCSoutheast Jun 2022
Detroit/Guilford/Belfast DG Area Study
Solar + storage
57.7 MWWithdrawn / abandoned Piscataquis, MEISO-NE May 2022target 2027
Solar + storage project C2-134, Millard County
Solar + storage
57.5 MWWithdrawn / abandoned Millard, UTWest May 2022target 2026
Solar + storage project C2-129, San Juan County
Solar + storage
57.5 MWWithdrawn / abandoned San Juan, UTWest May 2022target 2026
NY Schodack 634 Knickerbocker Rd Storage
Battery storage ยท Bluewave Storage Origination LLC
57.0 MWWithdrawn / abandoned Rensselaer, NYNYISO Jul 2022
Solar project 511, Crockett County
Solar
55.0 MWWithdrawn / abandoned Crockett, TNSoutheast Aug 2022target 2025
Battery storage project GEN-2022-060, Osage County
Battery storage
55.0 MWWithdrawn / abandoned Osage, OKSPP Jun 2022target 2027
Solar project 518, Madison County
Solar
55.0 MWWithdrawn / abandoned Madison, TNSoutheast Sep 2022target 2025
Battery storage project GEN-2022-027, Cochran County
Battery storage
55.0 MWWithdrawn / abandoned Cochran, TXSPP Jun 2022target 2028
Battery Storage
Battery storage
55.0 MWWithdrawn / abandoned Providence, RIISO-NE Oct 2022target 2027
Solar project 85, Hillsborough County
Solar
55.0 MWWithdrawn / abandoned Hillsborough, FLSoutheast Apr 2022target 2024
Solar project 91, Polk County
Solar
55.0 MWWithdrawn / abandoned Polk, FLSoutheast Nov 2022target 2025
Solar project 90, Hillsborough County
Solar
55.0 MWWithdrawn / abandoned Hillsborough, FLSoutheast Jun 2022target 2024
Homer Hill Storage
Battery storage ยท Origis Development
54.7 MWWithdrawn / abandoned Cattaraugus, NYNYISO Nov 2022
Solar project AI1-157, Mchenry County
Solar
54.4 MWWithdrawn / abandoned Mchenry, ILPJM Sep 2022target 2027
Solar
Solar
54.4 MWWithdrawn / abandoned Grafton, NHISO-NE Oct 2022target 2024
Solar Increase (QP1145)
Solar
54.1 MWWithdrawn / abandoned Hancock, MEISO-NE Aug 2022target 2026
Lewiston CMP Cluster 5
Solar + storage
52.5 MWWithdrawn / abandoned Oxford, MEISO-NE Mar 2022target 2028
Solar project J2635, Mason County
Solar
52.0 MWWithdrawn / abandoned Mason, ILMISO Sep 2022target 2026
Brentwood Energy Storage
Battery storage ยท NY Power Authority
52.0 MWWithdrawn / abandoned Suffolk, NYNYISO Jul 2022
Pouch Energy Storage
Battery storage ยท NY Power Authority
52.0 MWWithdrawn / abandoned Richmond, NYNYISO Jul 2022
Solar project 569234, Johnston County
Solar
51.7 MWWithdrawn / abandoned Johnston, NCSoutheast Jun 2022
Battery Storage
Battery storage
51.7 MWWithdrawn / abandoned New London, CTISO-NE May 2022target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)