United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· SPP

Battery storage project GEN-2022-027, Cochran County

Battery storage project GEN-2022-027, Cochran County is a 55.0 MW battery storage request withdrawn in the SPP interconnection queue, in Cochran County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2022 (completed)
  2. Withdrawn / abandonedNov 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2022-027
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Lehman 115 kV Tap
Location
Cochran County, Texas
Technology
Battery: 55.0 MW
Total requested
55.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
13 June 2022
Proposed online date
October 2028
Withdrawn
November 2023

Location

Marker shows the centre of Cochran County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Cochran County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem