BATTERY STORAGE Β· SPPBattery storage project GEN-2022-027, Cochran County
Battery storage project GEN-2022-027, Cochran County is a 55.0 MW battery storage request withdrawn in the SPP interconnection queue, in Cochran County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2022 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-027
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Lehman 115 kV Tap
- Location
- Cochran County, Texas
- Technology
- Battery: 55.0 MW
- Total requested
- 55.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 13 June 2022
- Proposed online date
- October 2028
- Withdrawn
- November 2023
Location
Marker shows the centre of Cochran County; the queue data does not give exact sites.
Other requests in Cochran County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem