United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
SOLAR Β· PJMSolar project AI1-117
Solar project AI1-117 is a 60.0 MW solar request withdrawn in the PJM interconnection queue, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AI1-117
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Hopkins 138 kV
- Location
- West Virginia
- Technology
- Solar: 60.0 MW
- Total requested
- 60.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 6 September 2022
- Proposed online date
- September 2024
- Withdrawn
- October 2025
Location
No county location in the queue data.
Power plants in West Virginia Β· Transmission lines in West Virginia
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem