SOLAR Β· SOUTHEASTSolar project 511, Crockett County
Solar project 511, Crockett County is a 55.0 MW solar request withdrawn in the Southeast interconnection queue, in Crockett County, Tennessee, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 511
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Crockett County, Tennessee
- Technology
- Solar: 55.0 MW
- Total requested
- 55.0 MW
- Queue status
- Withdrawn
- Entered queue
- 2 August 2022
- Proposed online date
- October 2025
Location
Marker shows the centre of Crockett County; the queue data does not give exact sites.
Power plants in Tennessee Β· Transmission lines in Tennessee
Other requests in Crockett County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem