United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISONY Schodack 634 Knickerbocker Rd Storage
NY Schodack 634 Knickerbocker Rd Storage is a 57.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Rensselaer County, New York, connecting to NYTransco.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1408
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYTransco
- Developer
- Bluewave Storage Origination LLC
- Connection point (POI)
- Schodack – Valkin line 14 115 kV
- Location
- Rensselaer County, New York
- Technology
- Battery: 57.0 MW
- Total requested
- 57.0 MW
- Queue status
- Withdrawn
- Entered queue
- 25 July 2022
- Withdrawn
- March 2023
Location
Marker shows the centre of Rensselaer County; the queue data does not give exact sites.
Other requests in Rensselaer County
- Willard Storage (NYISO-C24-148)Battery storage · 300 MW · in study
- Willard StorageBattery storage · 300 MW · in study
- SolarSolar · 20.0 MW · in study
- Hilltop SolarSolar · 20.0 MW · in study
- CS Hawthorn SolarSolar · 20.0 MW · in study
- Empire GeneratingGas · 635 MW · built
- Empire GeneratingGas · 635 MW · built
- StephentownBattery storage · 20.0 MW · built
- StephentownBattery storage · 20.0 MW · built
- Knickerbocker Energy StorageBattery storage · 300 MW · withdrawn
- Topaz Storage ProjectBattery storage · 200 MW · withdrawn
- Honey Bee Battery Storage, LLCBattery storage · 199 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem