United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in the USA — page 299
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project J1707, Dubois County Solar |
72.0 MW | Withdrawn / abandoned |
| Solar project 153790, Duplin County Solar |
72.0 MW | Withdrawn / abandoned |
| Solar project AE2-314, Atlantic County Solar |
72.0 MW | Withdrawn / abandoned |
| Solar project GI-2018-23, Park County Solar |
72.0 MW | Withdrawn / abandoned |
| Windwood Project Onshore wind · Lincoln Renewable Energy, LLC |
72.0 MW | Withdrawn / abandoned |
| Solar Solar |
72.0 MW | Withdrawn / abandoned |
| Solar project 920661, Wayne County Solar |
72.0 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2010-047, Jefferson County Onshore wind |
72.0 MW | Withdrawn / abandoned |
| Battery storage project AH2-026, City Of Richmond County Battery storage |
72.0 MW | Withdrawn / abandoned |
| Solar project J634, Calcasieu Parish County Solar |
72.0 MW | Withdrawn / abandoned |
| Solar project 15650, Onslow County Solar · Duke Energy Progress, LLC |
72.0 MW | Withdrawn / abandoned |
| Solar project 1RSC-2020-01, Park County Solar |
72.0 MW | Withdrawn / abandoned |
| Other project PP999999, Wayne County Other |
72.0 MW | Withdrawn / abandoned |
| Anna River Solar Solar · Anna River Solar, LLC |
72.0 MW | Withdrawn / abandoned |
| Redwood House Wind Power Plant Onshore wind |
72.0 MW | Withdrawn / abandoned |
| Battery storage project 44634, Onslow County Battery storage · Duke Energy Progress, LLC |
72.0 MW | Withdrawn / abandoned |
| Solar project GEN-2018-039, Lamoure County Solar |
72.0 MW | Withdrawn / abandoned |
| Paniolo Solar Solar + storage |
72.0 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2009-015, Pawnee County Onshore wind |
72.0 MW | Withdrawn / abandoned |
| Solar project 15739, Onslow County Solar · Duke Energy Progress, LLC |
72.0 MW | Withdrawn / abandoned |
| Hoffman Falls Wind Onshore wind · Liberty Renewables Inc. |
72.0 MW | Withdrawn / abandoned |
| Other project Q367, Navajo County Other |
72.0 MW | Withdrawn / abandoned |
| Solar + storage project Q397, Navajo County Solar + storage |
72.0 MW | Withdrawn / abandoned |
| Iron Javelin Emerald Solar · Emerald Renewable LLC |
72.0 MW | Withdrawn / abandoned |
| Solar project 963471, Wayne County Solar |
72.0 MW | Withdrawn / abandoned |
| Stillwater Storage Other · Cypress Creek Renewables |
72.0 MW | Withdrawn / abandoned |
| Poplar Camp Onshore wind |
72.0 MW | Withdrawn / abandoned |
| Rugged Solar Farm Solar |
71.9 MW | Withdrawn / abandoned |
| High Chap Storage Battery storage · HIGH CHAPARRAL SOLAR PROJECT LLC |
71.8 MW | Withdrawn / abandoned |
| Wild West Solar Solar |
71.6 MW | Withdrawn / abandoned |
| Turon Energy Storage Battery storage |
71.5 MW | Withdrawn / abandoned |
| Curry Solar Solar |
71.5 MW | Withdrawn / abandoned |
| Solar project AE2-037, Bertie County Solar |
71.5 MW | Withdrawn / abandoned |
| Warren Solar 1 Solar |
71.5 MW | Withdrawn / abandoned |
| Solar project IC-563, Macon County Solar |
71.4 MW | Withdrawn / abandoned |
| Onshore wind project 95, Tooele County Onshore wind · Pioneer Ridge, LLC |
71.4 MW | Withdrawn / abandoned |
| Solar project 145468, Harnett County Solar |
71.3 MW | Withdrawn / abandoned |
| Yermo Solar 1 Solar |
71.1 MW | Withdrawn / abandoned |
| Gas project C4-058, Juab County Gas · PacifiCorp |
71.0 MW | Withdrawn / abandoned |
| Battery storage project GEN-2020-055, Bowie County Battery storage |
71.0 MW | Withdrawn / abandoned |
| Battery storage project AH1-761, New Castle County Battery storage · Freepoint Solar LLC |
71.0 MW | Withdrawn / abandoned |
| Solar project 334, Quitman County Solar |
71.0 MW | Withdrawn / abandoned |
| Onshore wind project 2022-G12 Onshore wind |
71.0 MW | Withdrawn / abandoned |
| Gas project PIS060, Juab County Gas · PacifiCorp |
71.0 MW | Withdrawn / abandoned |
| Gas project 336, Utah County Gas |
71.0 MW | Withdrawn / abandoned |
| Limestone Wind Farm Onshore wind · Pioneer Green Energy, LLC |
71.0 MW | Withdrawn / abandoned |
| Onshore wind project H039, Tama County Onshore wind |
71.0 MW | Withdrawn / abandoned |
| Onshore wind project 272, Cumberland County Onshore wind |
71.0 MW | Withdrawn / abandoned |
| Battery storage project 479, Jackson County Battery storage |
71.0 MW | Withdrawn / abandoned |
| Albacore ESS Battery storage |
70.9 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)