United States βΊ Grid βΊ Interconnection queues βΊ Utah
ONSHORE WIND Β· WESTOnshore wind project 95, Tooele County
Onshore wind project 95, Tooele County is a 71.4 MW onshore wind request withdrawn in the West interconnection queue, in Tooele County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2006 (completed)
- Withdrawn / abandonedApr 2011 (project stopped here)
- ConsentedFeb 2008 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 95
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Developer
- Pioneer Ridge, LLC
- Connection point (POI)
- Tooele-Dugway line
- Location
- Tooele County, Utah
- Technology
- Wind: 71.4 MW
- Total requested
- 71.4 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA signed 2/8/08, Suspended 2/25/08, Withdrawn 4/4/11-End of Suspension
- Queue status
- Withdrawn
- Entered queue
- 6 October 2006
- Agreement signed
- 8 February 2008
- Proposed online date
- December 2007
- Withdrawn
- April 2011
Location
Marker shows the centre of Tooele County; the queue data does not give exact sites.
Other requests in Tooele County
- Solar project 781, Tooele CountySolar Β· 80.0 MW Β· agreement signed
- Solar project 846, Tooele CountySolar Β· 75.0 MW Β· agreement signed
- Solar + storage project C2-72, Tooele CountySolar + storage Β· 300 MW Β· in study
- Solar project S0020, Tooele CountySolar Β· 80.0 MW Β· in study
- Battery storage project S0018, Tooele CountyBattery storage Β· 75.0 MW Β· in study
- Solar + storage project T2-006, Tooele CountySolar + storage Β· 20.0 MW Β· in study
- Solar project C2-169, Tooele CountySolar Β· 99.0 MW Β· suspended
- Gas project 9, Tooele CountyGas Β· 80.0 MW Β· built
- Solar project 639, Tooele CountySolar Β· 2.0 MW Β· built
- Solar project 438, Tooele CountySolar Β· 1.8 MW Β· built
- Onshore wind project 638, Tooele CountyOnshore wind Β· 1.7 MW Β· built
- Onshore wind project 439, Tooele CountyOnshore wind Β· 1.6 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem