Solar + storage project Q397, Navajo County

Solar + storage project Q397, Navajo County is a 72.0 MW solar + storage request withdrawn in the West interconnection queue, in Navajo County, Arizona, connecting to Arizona Public Service.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q397
Grid region
West (non-ISO utilities)
Utility / transmission owner
Arizona Public Service
Connection point (POI)
69 kV interconnection into the Leroux 69 kV substation
Location
Navajo County, Arizona
Technology
Solar: 72.0 MW Β· Battery
Total requested
72.0 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
15 September 2021
Proposed online date
January 2025

Location

Marker shows the centre of Navajo County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Navajo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem