πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

GAS Β· WEST

Gas project PIS060, Juab County

Gas project PIS060, Juab County is a 71.0 MW gas request withdrawn in the West interconnection queue, in Juab County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
PIS060
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Developer
PacifiCorp
Connection point (POI)
Mona substation
Location
Juab County, Utah
Technology
Gas: 71.0 MW
Total requested
71.0 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
31 May 2024
Proposed online date
January 2026

Location

Marker shows the centre of Juab County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Juab County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem